MANUFACTURING PROCESS
Ten steps that take your project from brief to shipment
We run every project through the same ten steps, record each critical approval in writing and report progress to you regularly.
Lead time depends on order quantity and product construction, and is confirmed in writing with the quotation for each project.
THE STEPS
Explore each step with its owner and control point
The process images in this section are illustrative scenes created with ImageGen.
CONTROL POINTS
We catch risks at every stage of production
5Written approval points
4Physical inspection stages across production
%100Metal detection coverage
AQL 2.5Final inspection sampling level
RESPONSIBILITY TABLE
The team that gives written sign-off at each step
We sign off the output of each step in writing and only move to the next step once that approval is in place.
| Step | Responsible team | Control point |
|---|---|---|
| 01 Brief and feasibility review | Sales + Design | Feasibility sign-off |
| 02 Quotation and project plan | Sales | Written quotation approval |
| 03 Technical design and material selection | Design | Material and colour approval |
| 04 Sample and revision | Sample workshop | Sample approval by the customer |
| 05 Pre-production sample (PPS) | Design + Production | PPS approval |
| 06 Material sourcing and incoming inspection | Procurement + Quality | Incoming material acceptance |
| 07 Cutting and sewing | Production | First-piece approval |
| 08 Filling and finishing | Production + Quality | In-line inspection record |
| 09 Final inspection and testing | Quality | Final inspection report |
| 10 Packing and delivery | Logistics | Loading report |
YOUR PRODUCTION PLAN
Share your quantity and target date and we plan the line together
We set out how each stage from cutting to packing is scheduled for your project and confirm the lead time in writing with the quotation.









